Summary of Proposed Investment

This Summary of Proposed Investment is prepared and distributed to the public in advance of the IFC Board of Directors’ consideration of the proposed transaction. Its purpose is to enhance the transparency of IFC’s activities, and this document should not be construed as presuming the outcome of the Board decision. Board dates are estimates only.

Project number 27952
Company nameCartones America, S.A.
CountryColombia
SectorIndustrial & Consumer Products
Environmental categoryC
DepartmentGlobal Manufacturing & Services
StatusActive
Date SPI disclosedJanuary 29, 2009
Projected board dateMarch 1, 2009
Previous EventsInvested: June 24, 2009
Signed: March 30, 2009
  Overview     Sponsor/Cost/Location     Development Impact     Contacts     Attachments  

Project description
Cartones America is planning to reduce their use of energy at their plant in Cali, Colombia. The energy efficiency improvement project planned by Cartones consist several sub-projects which will help it to reduce its energy consumption and thus reduce the operating cost for energy by almost 17% annually. This project is an overall energy systems improvement which will consist of improving the electrical system, such as lowering the voltage setting on the transformers, improving the transmission efficiency of motor by using poly V-belts instead of ordinary V-belts, increase the efficiency of the electric motor by replacing large standard efficiency motors with high efficiency motors and also down sizing motors so that they operate at optimal loading, the plant will also install variable speed drives on some application so that the supplied power to the machines matches the demand and also improve its lighting and refrigeration systems. On the thermal side the plant will be improving the efficiency of its boilers by installing automatic air-fuel regulators, improving its insulation on its steam pipes, valves and flanges and most importantly it will be improving the steam/ condensate management system at its Paper machine 3 so that its specific steam consumption will be reduced. Together, these “Cleaner Production” investment for energy efficiency qualify for funding via IFC’s Board approved Cleaner Production Lending Pilot, a $20 million Facility via which IFC can provide Cleaner Production sub-loans to its existing portfolio clients.